Almaty Metro Facts and History
Coaches of Almaty Metro run a modern rapid transit system. The first line of Almaty Metro opened on 1 December 2011. 9 kilometre extension opened in 2015 with two stations.
What the video says
Coaches of Almaty Metro run a modern rapid transit system.
The first line of Almaty Metro opened on 1 December 2011.
A 2.9 kilometre extension opened in 2015 with two stations.
Two new stations opened in 2022, adding 3.1 kilometres.
The first line runs 10.3 kilometres with nine stations total.
Seven four-car trains by Hyundai run with full air conditioning.
Daily operations last from 6:20 a.m. to midnight local time.
Fare costs 120 tenge as of 2024, paid by card.
Stations use granite stones from Kurdai, Kurta, and Kapal-Arasan.
Construction began in 1988 but paused after the Soviet collapse.
The Almaly to Abai tunnel is 1.271 kilometres long and deep.
Daily ridership reached 80 thousand on weekdays after 2022 openings.
A 5.52 kilometre extension to Kalkaman is expected by 2025.
A northern extension of 8.76 kilometres is planned before 2035.
Source
More to watch
More about KazakhstanMore from WorldAll technology videos
- The Corsac Fox Explained
- The Wild Apple Behind Your Snack
- Channel Tunnel is the longest underwater tunnel
- Africa’s Longest Bridge Lost Its Title in 1996
- Is the Bermuda Triangle dangerous? NOAA says no
- The tongue map is a myth: every part tastes everything
- The Saiga Antelope's Strange Face
- The Dombra Explained