The Millau Viaduct is a cable-stayed bridge across the Tarn gorge valley in Southern France. Completed in 2004. Engineer Michel Virlogeux and architect Norman Foster led the design team.
What the video says
The Millau Viaduct is a cable-stayed bridge across the Tarn gorge valley in Southern France. Completed in 2004.
Engineer Michel Virlogeux and architect Norman Foster led the design team.
The high solution choice was officially decided then.
Construction cost three hundred ninety four million euros. Builder Eiffage financed it for a toll concession until two thousand eighty.
Workers built the road deck on plateaus at both ends. They pushed each half onto the pylons using launching techniques.
Each pylon sits on four concrete pilings. Every piling is 15 metres deep and 5 metres in diameter.
Sliding shuttering let each pylon rise 4 metres every three days.
It was inaugurated on 14 December 2004. Traffic started two days later.
Source
More to watch
More about FranceMore from WorldAll technology videos
- Mont-Saint-Michel's Timeless Island
- Mont Blanc: Europe's Alpine Giant
- The robot wrote his report in four seconds. Brian had a plan
- Pendulum Clock Timekeeper
- Codex Gigas weighs 74.8 kilograms
- He dug up Ramses II in his garden, then called the authorities
- The Tour de France Explained
- Le crêt de la Neige, toit du Jura